Steel Partitioning Installation Completed for Clive Sutton

Steel Partitioning Installation Completed for Clive Sutton

Industrial Partitions has recently completed a bespoke steel partitioning installation for Clive Sutton at Unit 1, The Oxgate Centre.

The client required a secure, practical and professionally fitted partitioning system to support their workshop operations. The aim was to create clearly defined areas within the industrial unit while maintaining visibility, workflow and easy access throughout the space.

Final Design

Working from the site layout, our team designed a steel partitioning solution that combined mesh steel partitioning, solid panelled partitioning and integrated double-door access.

The mesh partitioning was used to create strong, secure enclosures while still allowing visibility and light to pass through the workspace. In areas where a more enclosed finish was required, solid steel partitioning was installed to provide a clean, robust and professional appearance.

The final design was tailored around the building layout, access points and the client’s day-to-day operational requirements.

Site plan drawing showing the proposed steel partitioning layout and workshop areas for Clive Sutton at The Oxgate Centre

Final Project

The completed installation has provided Clive Sutton with a durable and well-organised partitioning system that supports the practical needs of their workshop environment.

The new steel partitioning helps improve separation, safety and security across the space, creating dedicated working zones without disrupting the open feel to the industrial unit.

From initial planning through to final installation, the project was delivered to suit the client’s exact site requirements, resulting in a high-quality finish that is both functional and built to last.

Project Photos

The finished project photos show the completed steel partitioning system in place, including the mesh enclosures, double door access points and solid panelled sections.

These images highlight the scale of the installation, the quality of the finish, and how the partitioning integrates with the wider workshop space.

Steel mesh partitioning installation creating a secure enclosure inside Clive Sutton’s industrial workshop

Full height steel mesh partitioning enclosure installed inside Clive Sutton’s workshop facility

Steel mesh partitioning enclosure with integrated double doors for secure workshop access

Double skin steel partitioning system installed to create an enclosed area within Clive Sutton’s industrial unit

Steel mesh partitioning installed around existing pipework and services inside an industrial workshop

Get In Touch

Looking to create a secure store, machinery enclosure, dedicated working area or separated zone within your industrial unit?

Industrial Partitions can design, supply, and install a steel partitioning solution tailored to your space, your workflow and your operational needs.

Get in touch with Industrial Partitions today to discuss your upcoming steel partitioning installation.

Call us on 0115 736 5986 or email sales@aci.uk.net. Alternatively, fill in the form below and a member of our team will be in touch! 🙂